There is a little difference to the mobile crushing station while installing this kinds of machine, and there is no specific requirement for installing the feeder and crushers, and the operators only being required to do according to the instrument can do well, and the feeding device must be supported by most of the stands above on the middle body, and those stands should be linked by the bolts while the discharging port and the feeding port should be lined by the bolts, too.
0 Comments